CASE STUDIES

Silo Park

 

SiloPark-casestudyProject Name: Silo Park, Auckland, New Zealand
Contractor: Culham Engineering
Client: Auckland City Council

The Situation

The Client required a walkway grating that would be suitable for public access that was low maintenance.

As this platform was going to be exposed to high public foot traffic, it had to meet the following criteria:

  • A maximum clear opening so that children’s toes and feet were not going to get caught
  • High heel shoes were not going to get caught.
  • A high level of corrosion protection due to the close proximity to sea spray exposure.

The Solution

Perry Grating Heelguard was specified for this project as it met all the criteria to satisfy the Client and Contractors needs. Heelguards 9mm clear opening met the requirements for the Project.

All Perry Grating Steel grating is galvanized to AS/NZ4680 standard, offering a high level of corrosion protection for the Walkway platform.